CITYFLO 650 – Klang Valley Mass Rapid Transit Line 1, Malaysia

Traduction en cours

Bombardier Transportation is currently delivering its advanced, fully-automated CITYFLO 650 rail control solution for the first and second lines of the new, planned three-line Klang Valley Mass Rapid Transit (KVMRT) network.

Full operation on Line 1 (known as the Sungai Buloh-Kajang (SBK) Line) opened on July 17, following initial phase one operation since December 2016.

Project summary:

  • Fully-automated CITYFLO 650 automatic train control technology
  • Bombardier’s scope includes the design, supply, installation and commissioning of the CITYFLO 650 communications-based train control (CBTC) solution for driverless operation
  • Line 1 is 51 km long and includes 31 stations and onboard equipment for 58 trains plus a further 16 maintenance vehicles.
Cityflo-650-Klang-Valley-MRT-Malaysia-KL-map