INTEFLO 200 - Milan Junction, Italy

Italferr, the engineering subsidiary of the Italian State Railways, awarded Bombardier Transportation two contracts for the implementation of an INTERFLO 200 solution, comprising railway traffic management and safety systems, EBI Lock computer-based interlockings, and automatic block on the Pozzuolo-Treviglio line.

Under the contracts, Bombardier Transportation will supply, install, test and commission EBI Lock computer-based interlockings. The new interlockings will control a total of 333 signals, 161 point machines and 169 track circuits. Two automatic block systems will be installed on the Pozzuolo - Treviglio line and on the new Pozzuolo PJ1 AV Treviglio high-speed line. A total of 28 track circuits will be controlled by the new automatic block systems