CITYFLO 650 - Tianjin, China

The Tianjin Metro Line 2 and 3 project was awarded to Bombardier in June 2009. The project duration is 34 months. Bombardier is a subcontractor to China Railway Signal & Communication Corp. (CRSC). The value of this subcontract is USD39.6M. The project consists of 2 lines. Line 2 from west (Caozhuang) to east (Limingzhuang) is in the length of 22.6 km. with 19 stations and 23 6-car trains. And Line 3 from southwest (Gaoxingqu) to northeast (Xiaodian) is in the length of 21.6 km. with 23 stations and 27 6-car trains.