Viewing Projects from Asia-Pacific Change Filters Show All Projects
Select a Project
Project Name Country City
  • CITYFLO 250 - Manila, PhilippinesPhilippinesManila
  • CITYFLO 350 - Delhi, IndiaIndiaDelhi
  • CITYFLO 350 - Pusan, South KoreaSouth KoreaPusan
  • CITYFLO 450 - Bangkok, ThailandThailandBangkok
  • CITYFLO 550 - SingaporeSingaporeSingapore
  • CITYFLO 650 - Neihu LINE, TaiwanTaiwanTaipei
  • CITYFLO 650 - Shenzhen, ChinaChinaShenzhen
  • CITYFLO 650 - Tianjin, ChinaChinaTianjin
  • Electric Multiple Unit - Brisbane, AustraliaAustraliaBrisbane
  • Electric Multiple Unit New Generation Rollingstock – Queensland, Australia AustraliaBrisbane
  • Electrical Multiple Unit - Perth, AustraliaAustraliaPerth
  • FLEXITY 2 Light Rail System – Gold Coast, AustraliaAustraliaGold Coast
  • FLEXITY Classic – Adelaide, AustraliaAustraliaAdelaide
  • FLEXITY Swift – Melbourne, AustraliaAustraliaMelbourne
  • High Grade Coach - ChinaChina
  • High speed Train CRH1 – ChinaChina
  • INNOVIA APM 100 – Beijing Capital International Airport, ChinaChinaBeijing
  • INNOVIA APM 100 – Bukit Panjang, SingaporeSingapore
  • INNOVIA APM 100 – Guangzhou, ChinaChinaGuangzhou
  • INNOVIA ART 200 – Yongin, South KoreaSouth KoreaYongin
  • INNOVIA Metro – Taipei, TaiwanTaiwanTaipei
  • INNOVIA Metro 300 – Kuala Lumpur, MalaysiaMalaysiaKuala Lumpur
  • INTERFLO 200 - State Railway of Thailand Thailand
  • INTERFLO 250 - Korean National RailroadSouth Korea
  • INTERFLO 250 ERTMS Level 1 ATP system - TaiwanTaiwan
  • INTERFLO 450 - Beijing–Shanghai, ChinaChinaBeijing, Shanghai
  • INTERFLO 450 - Shanghai-Nanjing/Hangzhou, ChinaChina
  • INTERFLO 450 - Wuhan – Guangzhou LINE, ChinaChinaGuangzhou
  • Light Rail Transit System - Kuala Lumpur, MalaysiaMalaysiaKuala Lumpur
  • MOVIA 456 Metro – Line 1, Shenzhen, ChinaChinaShenzhen
  • MOVIA Metro – Delhi, IndiaIndiaDelhi
  • MOVIA Metro – Line 1 & 2, Guangzhou, ChinaChinaGuangzhou
  • MOVIA Metro – Line 1 (supplementary vehicles), Shanghai, ChinaChinaShanghai
  • MOVIA Metro – Line 7, 9 & 12, Shanghai, ChinaChinaShanghai
  • MOVIA Metro – Singapore Downtown lineSingaporeSingapore
  • Metro – Line 1 & 2, Shanghai, ChinaChinaShanghai
  • Passenger Coach - UzbekistanUzbekistan
  • VLocity 160 DMU- AustraliaAustralia

Metro – Ankara, Turkey

Bombardier Transportation, as a member of the Ankara Metro Consortium, delivered a fully automated metro system for Ankara Metro’s M1 line in 1997. Construction was completed on a 48-month schedule and consisted of underground tunnel boring, cut and cover, and elevated guideway sections. The Consortium also arranged for complete financing of the project, including Canadian and UK export credits and a commercial loan from an international bank syndicate.

Project summary:

  • 108 automated vehicles operate as 36 three-car trains
  • The 14 km line serves 12 stations
  • Designed to carry 40,000 passengers per hour per direction during peak hours
  • Bombardier designed and supplied the vehicle fleet, automatic train control, communications and maintenance equipment, and provided overall systems engineering, integration, training and system test and commissioning
  • Bombardier also provided operations and maintenance advisory services

 

Contract Type

Full Turnkey

System Length

14.6 km (9.1 mi.)

Number of Stations

12

Start of Revenue Service

1997

Fleet Size

108 automated vehicles

metro-ankara-sysmap