Viewing Projects from Europe > Sweden Change Filters Show All Projects
Select a Project
Project Name Country City
  • CITYFLO 250 - Stockholm, SwedenSwedenStockholm
  • CONTESSA Electric Multiple Unit - Denmark and SwedenDenmark, Sweden
  • FLEXITY Swift – Stockholm, Sweden SwedenStockholm
  • INTERFLO 150 - LKAB, SwedenSwedenKiruna
  • INTERFLO 150 - Malmbanan, SwedenSweden, NorwayRiksgränsen, Boden
  • INTERFLO 150 - Repbäcken - Malung (Västerdalsbanan), SwedenSwedenRepbäcken
  • INTERFLO 200 & 250 - Oresund Link - Sweden, DenmarkSweden, Denmark
  • INTERFLO 200 - Arlandabanan, SwedenSweden
  • INTERFLO 200 Oresundsbanan total signalling - SwedenSweden
  • INTERFLO 450 & 250 - Trafikverket, SwedenSweden
  • INTERFLO 450 - Botniabanan, SwedenSweden
  • INTERFLO 450 ERTMS Level 2 - Botniabanan, SwedenSweden
  • INTERFLO 550 Regional passenger line operation - SwedenSweden
  • IORE - Sweden, Norway Norway, Sweden
  • ITINO Diesel Multiple Unit Germany, Sweden
  • MOVIA C30 Metro – Stockholm, SwedenSwedenStockholm
  • Metro C20 – Stockholm, SwedenSwedenStockholm
  • REGINA Electric Multiple Unit - SwedenSweden
  • X2000- SwedenSweden

FLEXITY Outlook Light Rail System – Porto, Portugal

Bombardier Transportation, as a consortium member, was responsible for the design, supply, installation, testing and commissioning of the Metro do Porto light rail system. The four-line system connects with nine municipalities in the metropolitan area and interconnects with the city’s existing bus and railway lines. Delivered in stages, Phase 1 opened in 2002 and the entire system was completed in 2006.

Project summary:

  • The four lines total 60 km and feature 60 stations aboveground and 12 stations underground
  • Seventy-two 100% low-floor, bi-directional FLEXITY Outlook vehicles are comprised of seven modules
  • The total system capacity during peak hours is 20,300 passengers per hour per direction
  • Bombardier scope included the vehicles, CITYFLO 250 signalling solution, depot/workshop equipment and radio
  • Financing for the project was raised through a number of sources including a European Investment Bank, the Portuguese Government, the European Union and private financial markets.

 

Bombardier Scope of Work Full Turnkey
System Length 60 km (37.5 mi.)
Number of Stations 72
Start of Revenue Service 2002
Fleet Size 72 BOMBARDIER FLEXITY Outlook E-Series
flexity-tram-porto-sysmap